
Canino Electric served as the prime contractor on a high-stakes, design-build project involving the installation of new Main Distribution Frames (MDFs) while maintaining full operation of the existing MDFs throughout the duration of the work. The project spanned 13 tenant-occupied floors within a 37-story building and required extensive coordination across multiple disciplines. This project showcased Canino Electric’s ability to deliver complex, high-risk telecom infrastructure upgrades within fully operational and sensitive environments.
Services: General/Prime Contracting, Design/Build, Electrical Infrastructure, Low Voltage



